Falcon Heavy

The Falcon Heavy is a partially reusable heavy-lift launch vehicle designed and manufactured by SpaceX. It is derived from the Falcon 9 vehicle and consists of a strengthened Falcon 9 first stage as the center core with two additional Falcon 9-like first stages as strap-on boosters. The Falcon Heavy has the highest payload capacity of any currently operational launch vehicle, and the third-highest capacity of any rocket ever to reach orbit, trailing the Saturn V and Energia.

SpaceX conducted the Falcon Heavy’s maiden launch on February 6, 2018, at 3:45 p.m. EST (20:45 UTC). The rocket carried a Tesla Roadster belonging to SpaceX founder Elon Musk, carrying a dummy dubbed “Starman”, as a dummy payload. The second Falcon Heavy launch occurred on April 11, 2019 and all three booster rockets successfully returned to Earth. The third Falcon Heavy launch successfully occurred on June 25, 2019. Since then, the Falcon Heavy has been certified for the National Security Space Launch program.

The Falcon Heavy was designed to be able to carry humans into space beyond low Earth orbit, although as of February 2018, SpaceX has confirmed that they will not transport people on the Falcon Heavy, nor pursue the human-rating certification process to transport NASA astronauts. The Falcon Heavy and Falcon 9 will be replaced by the Starship launch system.

History

SpaceX breaking ground at Vandenberg AFB SLC-4E in June 2011 for the Falcon Heavy launch pad

Concepts for a Falcon Heavy launch vehicle using three Falcon 1 core boosters were initially discussed as early as 2003. The concept for three core booster stages of the company’s as-yet-unflown Falcon 9 was referred to in 2005 as the Falcon 9 Heavy.

SpaceX unveiled the plan for the Falcon Heavy to the public at a Washington DC news conference in April 2011, with initial test flight expected in 2013.

A number of factors delayed the planned maiden flight by 5 years to 2018, including two anomalies with Falcon 9 launch vehicles, which required all engineering resources to be dedicated to failure analysis, halting flight operations for many months. The integration and structural challenges of combining three Falcon 9 cores were much more difficult than expected.

In July 2017, Elon Musk said, “It actually ended up being way harder to do Falcon Heavy than we thought. … Really way, way more difficult than we originally thought. We were pretty naive about that.”

The initial test flight for a Falcon Heavy lifted off on February 6, 2018, at 3:45 pm EST, carrying its dummy payload, Elon Musk’s personal Tesla Roadster, beyond Mars orbit.

Conception and funding

Musk mentioned Falcon Heavy in a September 2005 news update, referring to a customer request from 18 months prior. Various solutions using the planned Falcon 5 (which was never flown) had been explored, but the only cost-effective, reliable iteration was one that used a 9-engine first stage — the Falcon 9. The Falcon Heavy was developed with private capital with Musk stating that the cost was more than $500 million. No government financing was provided for its development.

Design and development

From left to right, Falcon 1, Falcon 9 v1.0, three versions of Falcon 9 v1.1, three versions of Falcon 9 v1.2 (Full Thrust), three versions of Falcon 9 Block 5, Falcon Heavy and Falcon Heavy Block 5

The Falcon Heavy design is based on Falcon 9’s fuselage and engines.

By 2008, SpaceX had been aiming for the first launch of Falcon 9 in 2009, while “Falcon 9 Heavy would be in a couple of years”. Speaking at the 2008 Mars Society Conference, Musk also indicated that he expected a hydrogen-fueled upper stage would follow 2–3 years later (which would have been around 2013).

By April 2011, the capabilities and performance of the Falcon 9 vehicle were better understood, SpaceX having completed two successful demonstration missions to LEO, one of which included reignition of the second-stage engine. At a press conference at the National Press Club in Washington, DC. on April 5, 2011, Musk stated that Falcon Heavy would “carry more payload to orbit or escape velocity than any vehicle in history, apart from the Saturn V Moon rocket … and Soviet Energia rocket”. In the same year, with the expected increase in demand for both variants, SpaceX announced plans to expand manufacturing capacity “as we build towards the capability of producing a Falcon 9 first stage or Falcon Heavy side booster every week and an upper stage every two weeks”.

In 2015, SpaceX announced a number of changes to the Falcon Heavy rocket, worked in parallel to the upgrade of the Falcon 9 v1.1 launch vehicle. In December 2016, SpaceX released a photo showing the Falcon Heavy interstage at the company headquarters in Hawthorne, California.

Testing

By May 2013, a new, partly underground test stand was being built at the SpaceX Rocket Development and Test Facility in McGregor, Texas, specifically to test the triple cores and twenty-seven rocket engines of the Falcon Heavy. By May 2017, SpaceX conducted the first static fire test of flight-design Falcon Heavy center core at the McGregor facility.

In July 2017, Musk discussed publicly the challenges of testing a complex launch vehicle like the three-core Falcon Heavy, indicating that a large extent of the new design “is really impossible to test on the ground” and could not be effectively tested independent of actual flight tests.

By September 2017, all three first stage cores had completed their static fire tests on the ground test stand. The first Falcon Heavy static fire test was conducted on January 24, 2018.

Maiden flight

In April 2011, Musk was planning for a first launch of Falcon Heavy from Vandenberg Air Force Base on the West Coast in 2013. SpaceX refurbished Launch Complex 4E at Vandenberg AFB to accommodate Falcon 9 and Heavy. The first launch from the Cape Canaveral East Coast launch complex was planned for late 2013 or 2014.

Due partly to the failure of SpaceX CRS-7 in June 2015, SpaceX rescheduled the maiden Falcon Heavy flight in September 2015 to occur no earlier than April 2016, but by February 2016 had postponed it again to late 2016. The flight was to be launched from the refurbished Kennedy Space Center Launch Complex 39A.

In August 2016, the demonstration flight was moved to early 2017, then to summer 2017, to late 2017 and was launched in February 2018.

At a July 2017 meeting of the International Space Station Research and Development meeting in Washington, D.C., Musk downplayed expectations for the success of the maiden flight:

There’s a real good chance the vehicle won’t make it to orbit … I hope it makes it far enough away from the pad that it does not cause pad damage. I would consider even that a win, to be honest.

In December 2017, Musk tweeted that the dummy payload on the maiden Falcon Heavy launch would be his personal Tesla Roadster playing David Bowie’s “Life on Mars”, and that it would be launched into an orbit around the Sun that will reach the orbit of Mars. He released pictures in the following days. The car had three cameras attached to provide “epic views”.

On December 28, 2017, the Falcon Heavy was moved to the launch pad in preparation of a static fire test of all 27 engines, which was expected on January 19, 2018. However, due to the U.S. government shutdown that began on January 20, the testing and launch were further delayed.

The static fire test was conducted on January 24, 2018. Musk confirmed via Twitter that the test “was good” and later announced the rocket would be launched on February 6.

Maiden launch of the Falcon Heavy

On February 6, 2018, after a delay of over two hours due to high winds, Falcon Heavy lifted off at 3:45pm EST. Its side boosters landed safely on Landing Zones 1 and 2 a few minutes later. However, only one of the three engines on the center booster that were intended to restart ignited during its descent, causing it to hit the water next to the droneship at a speed of over 480 km/h (300 mph).

Initially, Elon Musk tweeted that the Roadster had overshot its planned heliocentric orbit, and would reach the asteroid belt. In fact, observations by telescopes showed that the Roadster would only slightly exceed the orbit of Mars at aphelion.

Later flights

A year after the successful demo flight, SpaceX had signed five commercial contracts worth $500–750 million, meaning that it had managed to cover the development cost of the rocket. The second flight, and first commercial one, occurred on April 11, 2019, launching Arabsat-6A. The third flight occurred on June 25, 2019 launching the STP-2 (DoD Space Test Program) payload. The payload was composed of 25 small spacecraft. Operational GTO missions for Intelsat and Inmarsat, which were planned for late 2017, were moved to the Falcon 9 Full Thrust rocket version as it had become powerful enough to lift those heavy payloads in its expendable configuration.

Following the announcement of NASA’s Artemis program of returning humans to the Moon, the Falcon Heavy rocket has been mentioned several times as an alternative to the expensive SLS program. NASA director Jim Bridenstine announced that Falcon Heavy is powerful enough to launch the Orion capsule, but cannot launch it on top of the European Service Module in the same flight, and thus Falcon Heavy cannot be used as a replacement for SLS. However, Falcon Heavy will support commercial missions for the Artemis program, since it will be used to transport Dragon XL to the Lunar Gateway (see below for more on this).

Design

Falcon Heavy on pad LC-39A

Falcon Heavy consists of a structurally strengthened Falcon 9 as the “core” component, with two additional Falcon 9 first stages acting as liquid fuel strap-on boosters, which is conceptually similar to EELV Delta IV Heavy launcher and proposals for the Atlas V Heavy and Russian Angara A5V. Falcon Heavy has more lift capability than any other operational rocket, with a payload of 63,800 kilograms (140,700 lb) to low Earth orbit, 26,700 kilograms (58,860 lb) to Geostationary Transfer Orbit, and 16,800 kg (37,000 lb) to trans-Mars injection. The rocket was designed to meet or exceed all current requirements of human rating. The structural safety margins are 40% above flight loads, higher than the 25% margins of other rockets. Falcon Heavy was designed from the outset to carry humans into space and it would restore the possibility of flying crewed missions to the Moon or Mars.

The Merlin 1D engine

The first stage is powered by three Falcon 9 derived cores, each equipped with nine Merlin 1D engines. The Falcon Heavy has a total sea-level thrust at liftoff of 22,819 kN (5,130,000 lbf), from the 27 Merlin 1D engines, while thrust rises to 24,681 kN (5,549,000 lbf) as the craft climbs out of the atmosphere. The upper stage is powered by a single Merlin 1D engine modified for vacuum operation, with a thrust of 934 kN (210,000 lbf), an expansion ratio of 117:1 and a nominal burn time of 397 seconds. At launch, the center core throttles to full power for a few seconds for additional thrust, then throttles down. This allows a longer burn time. After the side boosters separate, the center core throttles back up to maximum thrust. For added reliability of restart, the engine has dual redundant pyrophoric igniters (TEA-TEB). The interstage, which connects the upper and lower stage for Falcon 9, is a carbon fiber aluminum core composite structure. Stage separation occurs via reusable separation collets and a pneumatic pusher system. The Falcon 9 tank walls and domes are made from aluminum-lithium alloy. SpaceX uses an all-friction stir welded tank. The second stage tank of Falcon 9 is simply a shorter version of the first stage tank and uses most of the same tooling, material, and manufacturing techniques. This approach reduces manufacturing costs during vehicle production.

All three cores of the Falcon Heavy arrange the engines in a structural form SpaceX calls Octaweb, aimed at streamlining the manufacturing process, and each core includes four extensible landing legs. To control the descent of the boosters and center core through the atmosphere, SpaceX uses small grid fins which deploy from the vehicle after separation. Immediately after the side boosters separate, the center engine in each burns for a few seconds in order to control the booster’s trajectory safely away from the rocket. The legs then deploy as the boosters turn back to Earth, landing each softly on the ground. The center core continues to fire until stage separation, after which its legs deploy and land back on Earth on a drone ship. The landing legs are made of carbon fiber with aluminum honeycomb structure. The four legs stow along the sides of each core during liftoff and later extend outward and down for landing.

Rocket specifications

Falcon Heavy specifications and characteristics are as follows:

Characteristic First stage core unit
(1 × center, 2 × booster)
Second stage Payload fairing
Height 42.6 m (140 ft) 12.6 m (41 ft) 13.2 m (43 ft)
Diameter 3.66 m (12.0 ft) 3.66 m (12.0 ft) 5.2 m (17 ft)
Dry Mass 22,200 kg (48,900 lb) 4,000 kg (8,800 lb) 1,700 kg (3,700 lb)
Fueled mass 433,100 kg (954,800 lb) 111,500 kg (245,800 lb) N/A
Structure type LOX tank: monocoque
Fuel tank: skin and stringer
LOX tank: monocoque
Fuel tank: skin and stringer
Monocoque halves
Structure material Aluminum–lithium skin; aluminum domes Aluminum–lithium skin; aluminum domes Carbon fiber
Engines 9 × Merlin 1D 1 × Merlin 1D Vacuum N/A
Engine type Liquid, gas generator Liquid, gas generator
Propellant Subcooled liquid oxygen, kerosene (RP-1) Liquid oxygen, kerosene (RP-1)
Liquid oxygen tank capacity 287,400 kg (633,600 lb) 75,200 kg (165,800 lb)
Kerosene tank capacity 123,500 kg (272,300 lb) 32,300 kg (71,200 lb)
Engine nozzle Gimbaled, 16:1 expansion Gimbaled, 165:1 expansion
Engine designer/manufacturer SpaceX SpaceX
Thrust, stage total 22,819 kN (5,130,000 lbf), sea level 934 kN (210,000 lbf), vacuum
Propellant feed system Turbopump Turbopump
Throttle capability Yes: 816–419 kN (190,000–108,300 lbf), sea level Yes: 930–360 kN (210,000–81,000 lbf), vacuum
Restart capability Yes, in 3 engines for boostback, reentry, and landing Yes, dual redundant TEA-TEB
pyrophoric igniters
Tank pressurization Heated helium Heated helium
Ascent attitude control:
pitch, yaw
Gimbaled engines Gimbaled engine and
nitrogen gas thrusters
Ascent attitude control:
roll
Gimbaled engines Nitrogen gas thrusters
Coast/descent attitude control Nitrogen gas thrusters and grid fins Nitrogen gas thrusters Nitrogen gas thrusters
Shutdown process Commanded Commanded N/A
Stage separation system Pneumatic N/A Pneumatic

The Falcon Heavy uses a 4.5-meter (15 ft) interstage attached to the first stage core. It is a composite structure consisting of an aluminum honeycomb core surrounded by a carbon fiber face sheet plies. The overall length of the vehicle at launch is 70 metres (230 ft), and the total fueled mass is 1,420,000 kg (3,130,000 lb). Without recovery of any stage, the Falcon Heavy can inject a 63,800 kg (140,700 lb) payload into a low Earth orbit, or 16,800 kg (37,000 lb) to Venus or Mars

The Falcon Heavy includes first-stage recovery systems, to allow SpaceX to return the first stage boosters to the launch site as well as recover the first stage core following landing at an Autonomous Spaceport Drone Ship barge after completion of primary mission requirements. These systems include four deployable landing legs, which are locked against each first-stage tank core during ascent. Excess propellant reserved for Falcon Heavy first-stage recovery operations will be diverted for use on the primary mission objective, if required, ensuring sufficient performance margins for successful missions. The nominal payload capacity to a geostationary transfer orbit (GTO) is 8,000 kg (18,000 lb) with recovery of all three first-stage cores (the price per launch is $90 million), vs. 26,700 kg (58,900 lb) in fully expendable mode ($150 million price per launch). The Falcon Heavy can also inject a 16,000 kg (35,000 lb) payload into GTO if only the two boosters are recovered.

Capabilities

Twenty-seven Merlin engines firing during launch of Arabsat-6A in 2019

Long exposure of a night launch, June 25, 2019

The partially reusable Falcon Heavy falls into the heavy-lift range of launch systems, capable of lifting 20 to 50 metric tons into low Earth orbit (LEO), under the classification system used by a NASA human spaceflight review panel. A fully expendable Falcon Heavy is in the super heavy-lift category with a maximum payload of 64 tons to low Earth orbit.

The initial concept (Falcon 9-S9 2005) envisioned payloads of 24,750 kg (54,560 lb) to LEO, but by April 2011 this was projected to be up to 53,000 kg (117,000 lb) with GTO payloads up to 12,000 kg (26,000 lb). Later reports in 2011 projected higher payloads beyond LEO, including 19,000 kilograms (42,000 lb) to geostationary transfer orbit, 16,000 kg (35,000 lb) to translunar trajectory, and 14,000 kg (31,000 lb) on a trans-Martian orbit to Mars.

By late 2013, SpaceX raised the projected GTO payload for Falcon Heavy to up to 21,200 kg (46,700 lb).

In April 2017, the projected LEO payload for Falcon Heavy was raised from 54,400 kg (119,900 lb) to 63,800 kg (140,700 lb). The maximum payload is achieved when the rocket flies a fully expendable launch profile, not recovering any of the three first-stage boosters. With just the core booster expended, and two side-boosters recovered, Musk estimates the payload penalty to be around 10%, which would still yield over 57 metric tons of lift capability to LEO. Returning all three boosters to the launch site rather than landing them on drone ships would yield about 30 metric tons of payload to LEO.

Maximum theoretical payload capacity
Destination Falcon Heavy Falcon 9
Aug 2013
to Apr 2016
May 2016
to Mar 2017
Since Apr 2017
LEO (28.5°) expendable 53,000 kg 54,400 kg 63,800 kg 22,800 kg
GTO (27°) expendable 21,200 kg 22,200 kg 26,700 kg 8,300 kg
GTO (27°) reusable 6,400 kg 6,400 kg 8,000 kg 5,500 kg
Mars 13,200 kg 13,600 kg 16,800 kg 4,020 kg
Pluto 2,900 kg 3,500 kg

Reusability

Falcon Heavy reusable side boosters land in unison at Cape Canaveral Landing Zones 1 and 2 following test flight on February 6, 2018.

From 2013 to 2016, SpaceX conducted parallel development of a reusable rocket architecture for Falcon 9, that applies to parts of Falcon Heavy as well.

Early on, SpaceX had expressed hopes that all rocket stages would eventually be reusable. SpaceX has since demonstrated routine land and sea recovery of the Falcon 9 first stage, and have successfully recovered multiple payload fairings. In the case of Falcon Heavy, the two outer cores separate from the rocket earlier in the flight, and are thus moving at a lower velocity than in a Falcon 9 launch profile. For the first flight of Falcon Heavy, SpaceX had considered attempting to recover the second stage, but did not execute this plan.

SpaceX has indicated that the Falcon Heavy payload performance to geosynchronous transfer orbit (GTO) will be reduced due to the addition of the reusable technology, but the rocket would fly at a much lower price. When recovering all three booster cores, GTO payload is 8,000 kg (18,000 lb). If only the two outside cores are recovered while the center core is expended, GTO payload would be approximately 16,000 kg (35,000 lb). As a comparison, the next-heaviest contemporary rocket, the fully expendable Delta IV Heavy, can deliver 14,210 kg (31,330 lb) to GTO.

Propellant crossfeed

Falcon Heavy was originally designed with a unique “propellant crossfeed” capability, whereby the center core engines would be supplied with fuel and oxidizer from the two side cores until their separation. Operating all engines at full thrust from launch, with fuel supplied mainly from the side boosters, would deplete the side boosters sooner, allowing their earlier separation to reduce the mass being accelerated. This would leave most of the center core propellant available after booster separation. The propellant crossfeed system was originally proposed in a 1998 book on orbital mechanics by Tom Logsdon, and nicknamed “asparagus staging”.

Musk stated in 2016 that crossfeed would not be implemented. Instead, the center booster throttles down shortly after liftoff to conserve fuel, and resumes full thrust after the side boosters have separated.

Environmental impact

BBC Science Focus, in February 2018, published an article on Falcon Heavy’s environmental impact. It stated concerns that frequent Falcon Heavy launches can contribute to pollution in the atmosphere.

The Planetary Society was concerned that launching a non-sterile object (as was done on the Falcon Heavy Test Flight) to interplanetary space may risk biological contamination of a foreign world. Scientists at Purdue University thought it was the “dirtiest” man-made object ever sent into space, in terms of bacteria amount, noting the car was previously driven on Los Angeles freeways. Although the vehicle will be sterilized by solar radiation over time, some bacteria might survive on pieces of plastic which could contaminate Mars in the distant future.

A study conducted by the Federal Aviation Administration found that the boost-back and landing of Falcon Heavy boosters “would not significantly affect the quality of the human environment.”

Launch prices

At an appearance in May 2004 before the United States Senate Committee on Commerce, Science, and Transportation, Musk testified, “Long term plans call for development of a heavy lift product and even a super-heavy, if there is customer demand. We expect that each size increase would result in a meaningful decrease in cost per pound to orbit. … Ultimately, I believe $500 per pound or less is very achievable.” This $1,100 per kilogram ($500/lb) goal stated by Musk in 2011 is 35% of the cost of the lowest-cost-per-pound LEO-capable launch system in a 2001 study: the Zenit, a medium-lift launch vehicle that could carry 14,000 kilograms (30,000 lb) into LEO for $35–50M. In 2011, SpaceX stated that the cost of reaching low Earth orbit could be as low as $2,200/kg ($1,000/lb) if an annual rate of four launches can be sustained, and as of 2011 planned to eventually launch as many as 10 Falcon Heavies and 10 Falcon 9s annually.

The published prices for Falcon Heavy launches have changed as development progressed, with announced prices for the various versions of Falcon Heavy priced at $80–125 million in 2011, $83–128M in 2012, $77–135M in 2013, $85M for up to 6,400 kg (14,100 lb) to GTO in 2014, $90M for up to 8,000 kg (18,000 lb) to GTO in 2016.

From 2017 onwards, the price has been stated at $150M for 63,800 kg (140,700 lb) to LEO or 26,700 kg (58,900 lb) to GTO (fully expendable). This equates to a price of $2,350 per kg to LEO and $5,620 per kg to GTO.

The nearest competing US rocket is ULA’s Delta IV Heavy with a LEO payload capacity of 28,370 kg costs $12,340 per kg to LEO and $24,630 per kg to GTO.

Competitors from 2023 onwards may include Blue Origin’s New Glenn (45,000 kg to LEO), ISRO’s SHLV (41,300 kg to LEO) and ULA’s Vulcan ACES (37,400 kg to LEO).

Launches and payloads

Due to improvements to the performance of Falcon 9, some of the heavier satellites flown to GTO, such as Intelsat 35e and Inmarsat-5 F4, ended up being launched before the debut of Falcon Heavy. SpaceX anticipated the first commercial Falcon Heavy launch would be three to six months after a successful maiden flight, but due to delays the first commercial payload, Arabsat-6A, was successfully launched on April 11, 2019, a year and two months after the first flight. SpaceX hopes to have 3 Falcon Heavy launches in 2020, and up to 10 launches every year after that.

Falcon Heavy launches
Flight No. Launch date Payload and mass Customer Price Outcome
1 February 6, 2018,
20:45 UTC
Elon Musk’s Tesla Roadster
~1,250 kg (2,760 lb)
SpaceX Internal Success
The Tesla Roadster was sent to a trans-Mars injection heliocentric orbit. Both side boosters landed successfully; the center booster struck the ocean and was destroyed after two of its engines failed to relight during the landing burn, damaging two of the drone ship’s engines.
2 April 11, 2019,
22:35 UTC
Arabsat-6A
6,465 kg (14,253 lb)
Arabsat undisclosed (list price $90 million) Success
Heavy communications satellite purchased by the Arab League. All three boosters landed successfully but the center core subsequently fell over during transport due to heavy seas. The two side-boosters were reused on the STP-2 launch.
3 June 25, 2019
6:30 UTC 
USAF STP-2
3,700 kg (8,200 lb)
DoD $160.9 million Success
The mission supported the U.S. Air Force National Security Space Launch (formerly EELV) certification process for the Falcon Heavy. The original contract price was 165 million, which was later reduced, in big part due to military’s agreement to fly the mission with reused side boosters. Secondary payloads include orbiters: LightSail 2, GPIM, OTB (hosting the Deep Space Atomic Clock), six COSMIC-2 (FORMOSAT-7), Oculus-ASR, Prox-1, and ISAT. Successfully reused the boosters from the second Falcon Heavy flight. The center core booster failed to land successfully and was destroyed upon impact in the Atlantic Ocean.
4 February 28, 2021 USSF-44 U.S. Air Force $130 million Scheduled
The first classified flight of Falcon Heavy. The contract was awarded to SpaceX for a price of under 30% of that of a typical Delta IV Heavy launch ($440 million). Payload includes two separate satellites and at least two additional rideshare payloads (including TETRA-1) and will weigh roughly 3.7 metric tons at launch. They will be launched in a direct geosynchronous orbit, necessitating for the first time a planned partially expendable launch, with only the two side-boosters recovered on droneships.
5 Q2 2021 USSF-52 U.S. Air Force c. $100 million  Planned
Second classified flight of Falcon Heavy, awarded in February 2019.
6 Q4 2021 ViaSat-3 Americas Viasat Planned
Falcon Heavy was originally slated to launch the Viasat-2 satellite, but due to delays an Ariane 5 rocket was used instead. Viasat maintained the launch option and will launch its next Ka band satellite, which will serve either of the APACEMEA or Americas regions, using Falcon Heavy. The upper stage of Falcon Heavy will deploy the satellite into a near-geosynchronous orbit that will include a coasting stage several hours long between burns.
NET Q4 2021 Inmarsat-6B Inmarsat TBA
Launch option maintained after a 2016 Falcon Heavy launch of European Aviation Network satellite was switched for an Ariane 5 launch in 2017. This option may be used for launching Inmarsat-6B in 2021, although SpaceX’s launch manifest lists Inmarsat for a Falcon 9 launch.
July 2022 Psyche NASA $117 million  Planned
Falcon Heavy will launch the Psyche orbiter mission, the Psyche spacecraft will visit the Psyche asteroid in the asteroid belt. The mission will carry two secondary payloads: Escape and Plasma Acceleration and Dynamics Explorers (EscaPADE), which will study the Martian atmosphere, and Janus, which will study binary asteroids.
Q3 2022 USSF-67 USAF $317 million
(includes new infrastructure)
Planned
First SpaceX launch of Phase 2 USAF contract, likely to be on a Falcon Heavy, and likely requiring a vertical integration building and an increased fairing size.
NET 2024 At least two Dragon XL flights NASA (Gateway Logistics Services) Planned
In March 2020, NASA announced its first contract for the Gateway Logistics Services that guarantees at least two launches on a new Dragon XL resupply spacecraft on top of a Falcon Heavy that will carry over 5 tonnes of cargo to the Lunar orbit on 6–12 months long missions.
TBA TBA Intelsat TBA
This was the first commercial agreement of a Falcon Heavy, and was signed in May 2012. In 2018, the option was still maintained but no satellite had been chosen.

First commercial contracts

In May 2012, SpaceX announced that Intelsat had signed the first commercial contract for a Falcon Heavy flight. It was not confirmed at the time when the first Intelsat launch would occur, but the agreement will have SpaceX delivering satellites to geosynchronous transfer orbit (GTO). In August 2016, it emerged that this Intelsat contract had been reassigned to a Falcon 9 Full Thrust mission to deliver Intelsat 35e into orbit in the third quarter of 2017. Performance improvements of the Falcon 9 vehicle family since the 2012 announcement, advertising 8,300 kg to GTO for its expendable flight profile, enable the launch of this 6,000 kg satellite without upgrading to a Falcon Heavy variant.

In 2014, Inmarsat booked three launches with Falcon Heavy, but due to delays they switched a payload to Ariane 5 for 2017. Similarly to the Intelsat 35e case, another satellite from this contract, Inmarsat 5-F4, was switched to a Falcon 9 Full Thrust thanks to the increased liftoff capacity. The remaining contract covers the launch of Inmarsat 6-F1 in 2020 on a Falcon 9.

First DoD contract

In December 2012, SpaceX announced its first Falcon Heavy launch contract with the United States Department of Defense (DoD). The United States Air Force Space and Missile Systems Center awarded SpaceX two Evolved Expendable Launch Vehicle (EELV)-class missions, including the Space Test Program 2 (STP-2) mission for Falcon Heavy, originally scheduled to be launched in March 2017, to be placed at a near circular orbit at an altitude of c. 700 km, with an inclination of 70°.

In April 2015, SpaceX sent the U.S. Air Force an updated letter of intent outlining a certification process for its Falcon Heavy rocket to launch national security satellites. The process includes three successful flights of the Falcon Heavy including two consecutive successful flights, and the letter stated that Falcon Heavy can be ready to fly national security payloads by 2017. But in July 2017, SpaceX announced that the first test flight would take place in December 2017, pushing the launch of the second launch (Space Test Program 2) to June 2018. In May 2018, on the occasion of the first launch of the Falcon 9 Block 5 variant, a further delay to October 2018 was announced, and the launch was eventually pushed back to June 25, 2019. The STP-2 mission used three Block 5 cores.

STP-2 payload

The payload for the STP-2 mission included 25 small spacecraft from the U.S. military, NASA, and research institutions: The Green Propellant Infusion Mission (GPIM) was a payload; it is a project partly developed by the US Air Force to demonstrate a less-toxic propellant. Another secondary payload is the miniaturized Deep Space Atomic Clock that is expected to facilitate autonomous navigation. The Air Force Research Laboratory’s Demonstration and Science Experiments (DSX) has a mass of 500 kg and will measure the effects of very low frequency radio waves on space radiation. The British ‘Orbital Test Bed’ payload is hosting several commercial and military experiments.

Other small satellites included Prox 1, built by Georgia Tech students to test out a 3D-printed thruster and a miniaturized gyroscope, LightSail by the Planetary Society, Oculus-ASR nanosatellite from Michigan Tech, and CubeSats from the U.S. Air Force Academy, the Naval Postgraduate School, the Naval Research Laboratory, the University of Texas at Austin, Cal Poly, and a CubeSat assembled by students at Merritt Island High School in Florida.

The Block 5-second stage allowed multiple reignitions to place its many payloads in multiple orbits. The launch was planned to include a 5,000 kg ballast mass, but the ballast mass was later omitted from the 3700 kg total mass for the payload stack.

Solar System transport missions

In 2011, NASA Ames Research Center proposed a Mars mission called Red Dragon that would use a Falcon Heavy as the launch vehicle and trans-Martian injection vehicle, and a variant of the Dragon capsule to enter the Martian atmosphere. The proposed science objectives were to detect biosignatures and to drill 1 meter (3.3 ft) or so underground, in an effort to sample reservoirs of water ice known to exist under the surface. The mission cost as of 2011 was projected to be less than US$425,000,000, not including the launch cost. SpaceX 2015 estimation was 2,000–4,000 kg (4,400–8,800 lb) to the surface of Mars, with a soft retropropulsive landing following a limited atmospheric deceleration using a parachute and heat shield. Beyond the Red Dragon concept, SpaceX was seeing potential for Falcon Heavy and Dragon 2 to carry science payloads across much of the Solar System, particularly to Jupiter’s moon Europa. SpaceX announced in 2017 that propulsive landing for Dragon 2 would not be developed further, and that the capsule would not receive landing legs. Consequently, the Red Dragon missions to Mars were canceled in favor of Starship, a larger vehicle using a different landing technology.

Lunar Gateway

Falcon Heavy is a candidate for the launch of the initial modules of the Lunar Gateway: Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO). To decrease complexity NASA announced in May 2020 that it considers launching the first two elements on a single rocket, citing Falcon Heavy as possible launch vehicle, for a 2023 launch date. Before switching to a merged launch, NASA listed in April 2020 Falcon Heavy as the launch vehicle for PPE lone launch.

In March 2020, Falcon Heavy won the first award to a resupply mission to the gateway, placing a new Dragon XL spacecraft on a translunar injection orbit.

NASA Psyche

NASA has chosen Falcon Heavy as the launch vehicle for its Psyche mission to a metallic asteroid with a planned launch in July 2022. The contract is worth $117 million.

Phase 2 USAF launches

SpaceX was awarded 40% of the launches in Phase 2 of the USA contract, which includes several launches and a vertical integration facility and development of a larger fairing.