Kempegowda International Airport (IATA: BLR, ICAO: VOBL) is an international airport serving Bangalore, the capital of the Indian state of Karnataka, in the southern part of India. Spread over 4,000 acres (1,600 ha), it is located about 30 kilometres (19 mi) north of the city near the suburb of Devanahalli. It is owned and operated by Bengaluru International Airport Limited (BIAL), a public–private consortium. The airport opened in May 2008 as an alternative to increased congestion at HAL Airport, the original primary commercial airport serving the city. It is named after Kempe Gowda I, the founder of Bangalore. Kempegowda International Airport became Karnataka’s first fully solar powered airport developed by CleanMax Solar.
Kempegowda Airport is the third-busiest airport by passenger traffic and total cargo handled in the country, behind the airports in Delhi and Mumbai, and is the 29th busiest airport in Asia. It handled around 10.91 million passengers in the calendar year 2020 with 311 aircraft movements a day. The cargo handled by the airport has decreased by 12.7% , with the airport handling about 326,372 tonnes (359,764 short tons) of cargo between April 2020 and March 2021 , compared to 374,062 tonnes (412,333 short tons) of cargo handled between April 2019 and March 2020.
The airport consists of two runways and a passenger terminal, which handles both domestic and international operations. The second runway, constructed by Larsen & Toubro, was commissioned on 6 December 2019. A second terminal is in the early stages of construction. Also, there is a cargo village and three cargo terminals. The airport serves as a hub for AirAsia India, Alliance Air, Go First, IndiGo and Star Air and is a focus city for Air India and SpiceJet. The airport is awarded as the best airport in Asia-Pacific in 2020 (25 to 40 million passengers per annum) by Airports Council International.
History
Planning (1991–2004)
The original airport serving Bangalore was HAL Airport, located 5 kilometres (3.1 mi) from the city centre. However, as Bangalore grew into the Silicon Valley of India and passenger traffic to the city rose, the airport was unable to cope. There was no room for expansion and the airport apron could only park six aircraft. In March 1991, former chairman of the National Airports Authority of India (NAAI) S. Ramanathan convened a panel to select the site for a new airport. The panel decided on Devanahalli, a village about 30 kilometres (19 mi) north of Bangalore. The State Government made a proposal to build the airport with private assistance, which the Union Government approved in 1994.
In December 1995, a consortium consisting of Tata Group, Raytheon and Singapore Changi Airport signed a memorandum of understanding with the State Government regarding participation in the project. In June 1998, however, the consortium announced it was pulling out of the project due to delays in government approval. These included disputes over the location of the airport and the fate of HAL Airport.
In May 1999, the Airports Authority of India (AAI) and the Karnataka State Industrial and Infrastructure Development Corporation (KSIIDC) of the State Government signed a memorandum of understanding regarding the nature of the project. It would be a public–private partnership, with AAI and KSIIDC having a 26% share and private companies having the remaining 74%. In January 2001, the State Government created the company Bengaluru International Airport Limited (BIAL) as a special purpose entity and began searching for partners. By November, the project had attracted Unique Zürich Airport, Siemens Project Ventures and Larsen & Toubro. Construction was expected to begin in October 2002; however, governmental delays persisted. The concession agreement between the State Government, the Union Government and BIAL was signed in July 2004. In it, BIAL required the closure of HAL Airport.
Construction and opening (2005–2008)
Construction finally commenced on 2 July 2005. When a study predicted the airport would receive 6.7 million passengers in 2008, the airport was redesigned from its initial capacity of 4.5 million passengers to 11 million, with the terminal size expanded and the number of aircraft stands increased. The cost of the airport rose to ₹19.3 billion (US$270 million). Construction was completed in 32 months, and BIAL set the launch date for 30 March 2008. However, due to delays in establishing air traffic control services at the airport, the launch date was pushed to 11 May and finally 24 May 2008.
As the opening date for the airport approached, public criticism arose, mainly directed toward the closure of HAL Airport. In March 2008, AAI employees conducted a massive strike against the closure of HAL Airport along with Begumpet Airport in Hyderabad, fearing they would lose their jobs. The Bangalore City Connect Foundation, a group of citizens and businessmen, staged a rally in mid-May, claiming the new airport was too small for the latest demand projections. On 23 May, a hearing was held at the Karnataka High Court over poor connectivity between the city and the airport. Ultimately, the State Government decided to go ahead with inaugurating the new airport and closing HAL Airport.
The first flight to the airport, Air India Flight 609 from Mumbai, was allowed to land the previous night as it would be continuing to Singapore shortly after midnight. The aircraft touched down at 10:40 pm on 23 May. The airport became the third greenfield airport under a public–private partnership to open in India, after Rajiv Gandhi International Airport in Hyderabad and Cochin International Airport.
Renaming and expansion (2009–present)
The original name of the airport was Bengaluru International Airport. In February 2009, the State Government sent a proposal to the Union Government to rename the airport after the founder of Bangalore, Kempe Gowda I. When no action was taken, the State Government passed a resolution for the name change in December 2011. The Union Government accepted the proposal in 2012 and formally approved it in July 2013. The airport was officially renamed Kempegowda International Airport on 14 December 2013 amid the inauguration of the expanded terminal building.
Kingfisher Airlines once operated a hub and was one of the largest airlines at Kempegowda Airport. Following its collapse in October 2012, other airlines stepped in to fill the gap in domestic connectivity by adding more flights. In addition, Air Pegasus and AirAsia India launched hub operations at the airport in 2014.
The first phase of expansion was launched in June 2011 and finished in December 2013. The ₹15 billion (US$210 million) project doubled the size of the passenger terminal to 150,556 square metres (1,620,570 sq ft), involving the construction of additional facilities for check-in, immigration, security and baggage reclaim. One domestic gate and three international gates were added as well. A large, sweeping roof connects the original building with the expanded areas. The expanded terminal, dubbed “Terminal 1A”, has raised the annual passenger capacity of the airport to 25 million.
Ethiopian Airlines began the first nonstop flights between Bangalore and Africa in 2019, linking the city to its hub in Addis Ababa. Two years later, an Air India Boeing 777-200LR arrived from San Francisco, marking the first direct service between the United States and Bangalore, as well as South India as a whole. The flights operate under a temporary arrangement between the Indian and American governments that facilitates nonstop air travel between the two countries during the COVID-19 pandemic. Air India has not indicated whether it will continue to fly this route after the agreement ends. United Airlines and American Airlines are scheduled to initiate non-stop flights from San Francisco and Seattle/Tacoma in December 2021 and January 2022 respectively.
Ownership
The airport is owned and operated by Bengaluru International Airport Limited (BIAL), a public limited company. The Government of India has granted BIAL the right to operate the airport for 30 years, with the option to continue for another 30 years. The company is a public–private consortium venture. 26% is held by government entities Karnataka State Industrial Investment and Development Corporation (13%) and Airports Authority of India (13%), and 74% is held by private companies Fairfax Financial (54%) and Siemens Project Ventures (20%).
Facilities
Duty Free
Runways
Kempegowda International Airport has two runways in use.
- Runway 09L/27R: 4,000 by 45 metres (13,123 ft × 148 ft), CAT I, ILS equipped.
- Runway 09R/27L: 4,000 by 60 metres (13,120 ft × 200 ft), CAT III, ILS equipped.
Four years after it was laid, the runway was entirely resurfaced because of a serious decline in quality. From 11 March to 3 April 2012, it was closed daily between 10:30 am and 5:30 pm. As a result, BIAL accused construction company Larsen & Toubro of building the runway poorly. South of runway 09/27 are a full-length parallel taxiway and the apron, which extends from the Blue Dart/DHL terminal to the passenger terminal.
The construction of the second runway at the airport is now complete, and was officially in use from 6 December 2019, when an Indigo airlines flight (6E 466) to Hyderabad took off from runway 09R. The runway will cater to all types of aircraft including Code-F aircraft like Airbus A380 and Boeing 747-8 and will be equipped with CAT IIIB ILS. The runway will also feature an associated parallel taxiway and two cross-field taxiways on the east linking the new runway to the existing north runway and the aprons at Terminal 1 and the upcoming Terminal 2. The existing runway will also be upgraded as part of the expansion work.
The old runway (Runway 09L/27R) was closed from 22 June 2020 for nine months for rehabilitation and strengthening. The runway was opened for service again on 31 March 2021 and now put into service with the south runway making KIA the first airport in South India to have parallel runway operations.
Terminals
International departures section at Kempegowda International Airport
A single integrated passenger terminal accommodates both domestic and international operations. It covers 150,556 m2 (1,620,570 sq ft) and can handle 20 million passengers annually. Check-in and baggage reclaim are situated on the lower floor, while departure gates are located on the first floor. Gates 1, 2, 12–18, 28–30 on the first floor are used for domestic departures, gates 31–42 on the first floor are used for international departures, gates 3–9 and gates 19–25 form the Western and Eastern bus gates respectively. Gate 41–42 is equipped to serve the world’s largest passenger aircraft, the Airbus A380. Lounges are provided by Above Ground Level and Plaza Premium Lounge, which also operates a day hotel in the terminal. For VIPs there is a separate 930-square-metre (10,000 sq ft) lounge.
Expansion
Under the second phase of the airport’s expansion, a new terminal called Terminal 2 is being built. The new terminal has been designed by renowned architectural firm Skidmore, Owings & Merrill and is being built by Larsen & Toubro. The first phase was expected to be completed by March 31, 2021, but the lockdown and resulting slowdown of construction activities is expected to delay the completion of the first phase of the Terminal 2 expansion, and is now estimated to be operational by the second quarter of calendar 2022. Phase 1 of Terminal 2 will augment the capacity of the airport by 25 million passengers per annum (MPPA).
Menzies Aviation Bobba and AISATS cargo terminals viewed from the road to the airport
Aviation fuel services
The airport has a fuel farm, spread over 11 acres (4.5 ha) west of the cargo village and passenger terminal. It was built by IndianOil SkyTanking Ltd (IOSL) but is shared by multiple oil companies. In October 2008, Indian Oil commissioned a 36-kilometre (22 mi) fuel pipeline between its storage terminal in Devanagonthi and Kempegowda Airport. Previously, jet fuel had to be transported to the airport by tank trucks, which created traffic and pollution problems.
Cargo facilities
Kempegowda Airport has three cargo terminals. One is operated by Menzies Aviation Bobba Pvt Ltd and has a capacity for 150,000 tonnes (170,000 short tons) of cargo; it includes a facility for storing pharmaceuticals. Air India SATS (AISATS) operates one terminal, which can handle 200,000 tonnes (220,000 short tons) of cargo. AISATS is also constructing the AISATS Coolport, which will be able to hold 40,000 tonnes (44,000 short tons) of perishable goods. Lastly, DHL and Blue Dart Aviation jointly operate a 20,500-square-metre (221,000 sq ft) terminal.
BIAL inaugurated a separate cargo village in December 2008. The village is spread over 11 acres (4.5 ha) and includes office space, conference rooms, a cafeteria for staff and parking space for nearly 80 trucks. It did not open for occupation until 2010 and initially suffered low occupancy, which some cargo agents attributed to the opening delay, high rent and limited infrastructure.
Future plans
The second phase of expansion is underway, which encompasses the construction of a second runway and passenger terminal. When complete, Kempegowda Airport will be able to handle 55 million passengers per year. The estimated ₹40 billion (US$560 million) project received clearance from the Ministry of Environment and Forests in September 2014.
Ground work on the second runway began in February 2016 and the runway opened in December 2019. Located south of the original terminal, it is parallel to runway 09/27 and measures 4,000 by 60 metres (13,120 ft × 200 ft), wider than the original runway so it can accommodate larger aircraft. The new runway is also CAT III certified, allowing for landings in fog and other low visibility conditions.
A second terminal will be constructed to cater to the airport’s growth. Terminal 2 has been designed by Skidmore, Owings & Merrill. The contract to construct Terminal 2 has also been awarded to Larsen & Toubro which will be constructed in two phases. In the first phase, the terminal will cater to 25 million passengers annually. Terminal 2 is estimated to cost ₹30.37 billion (US$430 million).
A third runway, north of the current runway is being planned to cater to the growth of air traffic in the airport which will be situated 1500 meters north of the current runway. Dubbed as the “New North Parallel Runway,”, the officials hope to ease air traffic congestion with the third runway.
IndiGo announced in January 2019, its plan to build a second maintenance repair and overhaul facility at the airport, which is expected to be operational by March 2020.
Statistics
See source Wikidata query and sources.
Airlines and destinations
Passenger
Airlines | Destinations |
---|---|
AirAsia India | Ahmedabad, Bagdogra, Bhubaneswar, Chennai, Delhi, Goa, Guwahati, Hyderabad, Jaipur, Kochi, Kolkata, Mumbai, Nagpur, Pune, Ranchi, Visakhapatnam |
Air India | Bhubaneswar, Chennai, Dehradun, Delhi, Guwahati, Hyderabad, Jaipur, Kolkata, Lucknow, Mangalore, Mumbai, Patna, Pune |
Alliance Air | Gulbarga, Hyderabad, Kochi, Kolhapur, Mysore |
American Airlines | Seattle/Tacoma (begins 6 January 2022) |
Flyme | Maamigili |
Go First | Ahmedabad, Bhubaneswar, Chandigarh, Delhi, Goa, Hyderabad, Jaipur, Kolkata, Lucknow, Mumbai, Patna, Port Blair, Pune, Ranchi, Surat, Varanasi |
IndiGo | Agartala, Agra, Ahmedabad, Allahabad, Amritsar, Aurangabad, Bagdogra, Bareilly, Belgaum, Bhopal, Bhubaneswar, Chandigarh, Chennai, Coimbatore, Dehradun, Delhi, Dibrugarh, Durgapur, Gaya, Goa, Gorakhpur, Guwahati, Hubli, Hyderabad, Imphal, Indore, Jaipur, Jodhpur, Jorhat, Kannur, Kanpur (begins 1 November 2021), Kochi, Kolkata, Kozhikode, Kurnool, Lucknow, Madurai, Mangalore, Mumbai, Nashik, Nagpur, Patna, Port Blair, Pune, Raipur, Rajahmundry, Rajkot, Ranchi, Shirdi, Silchar, Srinagar, Surat, Thiruvananthapuram, Tiruchirappalli, Tirupati, Tuticorin, Udaipur, Vadodara, Varanasi, Vijayawada, Visakhapatnam |
SpiceJet | Ahmedabad, Bagdogra, Belgaum, Chennai, Coimbatore, Darbhanga, Dehradun, Delhi, Durgapur, Goa, Gorakhpur, Guwahati, Gwalior, Hyderabad, Jabalpur, Jharsuguda, Kochi, Kolkata, Madurai, Mangalore, Mumbai, Nashik, Patna, Pondicherry (resumes 31 October 2021), Pune, Rajkot, Shirdi, Srinagar, Surat, Thiruvananthapuram, Varanasi, Vijayawada, Visakhapatnam |
Star Air | Belgaum, Gulbarga, Hubli, Hyderabad, Jamnagar |
TruJet | Bidar, Vidyanagar |
United Airlines | San Francisco (begins 25 March 2022) |
Vistara | Bagdogra, Chandigarh, Chennai, Delhi, Goa, Guwahati, Hyderabad, Mumbai |
Cargo
The following cargo airlines fly to the airport:
- Blue Dart Aviation
- Cathay Pacific Cargo
- DHL Aviation operated by AeroLogic
- Emirates SkyCargo
- Ethiopian Airlines Cargo
- Etihad Cargo
- FedEx Express
- Lufthansa Cargo
- MASKargo
- Qatar Airways Cargo
- Quikjet Cargo
- Sichuan Airlines
- Singapore Airlines Cargo
- SpiceXpress
- Turkish Airlines Cargo
- Uni-Top Airlines
Connectivity
The trumpet interchange between NH 7 and the road leading from Kempegowda Airport
BMTC Volvo buses connecting the city to the airport
Road
Kempegowda Airport is connected to the city of Bangalore by National Highway 44 (NH 44). In January 2014, a six-lane flyover was completed over NH 44 between Hebbal and the airport, helping to reduce travel time to and from the city. Two alternative routes are under construction and will be completed by March 2017, one through Thanisandra and the other through Hennur. The airport car park is located at ground level and can hold 2,000 vehicles. The airport is served by several taxi and rental car companies. In addition, ride-sharing companies Ola Cabs and Uber have their own pick-up zones outside the terminal.
The Bangalore Metropolitan Transport Corporation (BMTC) provides bus transportation to major parts of the city through the Vayu Vajra (Kannada for “Diamond in the Air”) service. It is operated using a fleet of Volvo B7RLE buses. In addition, the Karnataka State Road Transport Corporation (KSRTC) operates a nonstop bus service called “Flybus” between Kempegowda Airport and Mysore, as well as a route to Manipal via Mangalore.
Rail
A Namma Metro link between Bangalore city and the airport is planned with two stations at the airport. A high-speed rail link was previously considered and went as far as obtaining approval from the Union Government. However, the project was eventually scrapped because of high costs and the lack of stops along the line.
A halt at the KIA boundary commenced operations in January 2021. The train halt is connected to the airport terminal via short five-minute shuttle busses. Everyday five trains from the city towards Devanahalli stop at the KIA halt and five trains heading back. Future plans include hyper electrification of the route to introduce comfortable MEMU trains to the airport. Besides, MEMU trains from Mysore that terminate at Yelahanka could be extended up to Devanahalli via the KIA halt station, benefitting airport-bound passengers from Mysore, Ramanagaram and Bidadi.